L-Shaped Ground Advance Grouting Scheme in Bad Geological Section of Xianglushan Tunnel

  • ZHAO Lipeng ,
  • LI Jian ,
  • LEI Xiaotian ,
  • GUO Yaxin ,
  • WANG Tingchao ,
  • TAO Zhigang
Expand
  • (1. China Gezhouba Group Three Gorges Construction Engineering Co., Ltd., Yichang 443000, Hubei, China; 2. Yunnan Dianzhong Water Diversion Engineering Co., Ltd., Kunming 650000, Yunnan, China; 3. State Key Laboratory for Tunnel Engineering, China University of Mining and Technology (Beijing), Beijing 100083, China; 4. School of Mechanics and Civil Engineering, China University of Mining and Technology (Beijing), Beijing 100083, China)

Online published: 2024-07-12

Abstract

Large mud and water gushing and soft rock deformation often occur in-tunnel sections with poor geology. Therefore, an L-shaped ground directional drilling and grouting with an entire hole length of over 500 m assisted by in-tunnel advance grouting is proposed for the construction of the Xianglushan tunnel of the Central Yunnan water-conveyance project. The specific design scheme of the proposed method is determined. First, the on-site geological survey results reveal the technical difficulties of the unfavorable geological sections of the Xianglushan tunnel. The construction process and grouting technology of the L-shaped directional drilling grouting are explained. Second, a ground reinforcement scheme for L-shaped ground advance grouting is designed to improve the stratum stability. Finally, the on-site grouting effect is illustrated by tunnel face revelation, grouting results, and magnetotelluric analysis. The results show that the Z1 + Z2 + Z4 drilling field design is the optimal ground advance grouting scheme, and the L-shaped directional drilling grouting assisted with advance in-tunnel grouting technology can cover the grouting area in the blind area, realizing advance reinforcement.

Cite this article

ZHAO Lipeng , LI Jian , LEI Xiaotian , GUO Yaxin , WANG Tingchao , TAO Zhigang . L-Shaped Ground Advance Grouting Scheme in Bad Geological Section of Xianglushan Tunnel[J]. Tunnel Construction, 2024 , 44(6) : 1294 -1304 . DOI: 10.3973/j.issn.2096-4498.2024.06.016

Outlines

/

〈 〉