To rationally and
economically select a feasible lining structure for the shield section of the
Jintang subsea tunnel of the Ningbo-Zhoushan
railway, the characteristics of the subsea shield tunnel such as ultrahigh
water pressure, ultralong distance, complex sea environment, and challenges in
disaster prevention, evacuation, and rescue are summarized. A comprehensive
comparison of single- and double-layer lining structures is conducted in terms of structural stress
and deformation, specific subsea working conditions, longitudinal seismic
response, and risk mitigation. This analysis establishes the necessity,
feasibility, and economic advantages of the double-layer
lining structure. In addition, the double-layer lining
structure section is optimized to enhance the effective clearance area and
subrail structure type, enabling the realization of a full-ring superimposed double-layer
lining. The findings reveal the following: (1) Under static load conditions,
the structural deformation of the double-layer lining
scheme is relatively small, benefiting track smoothness, though comparable to
the single-layer lining scheme. Space should be
reserved for secondary lining, considering the complex construction environment
of the sea section and long-term safety. (2) Under
longitudinal earthquake conditions, the composite lining structure, consisting
of the secondary lining and segment, demonstrates stronger connection
performance, jointly bearing the load. This significantly reduces the peak
deformation and stress of the segment, with a maximum decrease of 20.58% at the
crown. Shock absorption measures address the vulnerability of the secondary
lining to tensile damage. (3) Using the R=P×C grading risk assessment method, the risk reduction cost (RMB 342
million) is lower than the expected risk loss cost (RMB 347 million),
indicating the superiority of the double-layer lining
structure. (4) The effective above-rail net clearance
area is optimized to 83.79 m2, resulting in a
reasonable change in the maximum stress on the train surface and transient
pressure. The net clearance area is 4.3% less than the double-layer lining with a net clearance area of no less than 90 m2 and a cross-sectional diameter of 14.6 m. (5) Based on disaster prevention,
evacuation, and rescue requirements, as well as the aerodynamic effects of the
cross-section, the subrail structure type is optimized.
The circle range of the full-ring superimposed double-layer lining achieves 90.70%, with the cross-section diameter reduced by 2.1% compared to the full-ring 30 m cast-in-place
secondary lining, which has a cross-section diameter of
14.3 m.
MAO Sheng
,
JIAO Qizhu
,
XIAO Mingqing
,
LIU Yan
.
DoubleLayer Lining Scheme for Jintang Subsea Tunnel of Ningbo-Zhoushan
Railway
[J]. Tunnel Construction, 2024
, 44(12)
: 2510
-2520
.
DOI: 10.3973/j.issn.2096-4498.2024.12.018