Disc Cutter Wear of Tunnel Boring Machine in Hard Rocks of Pumped Storage Hydropower Station

  • JIANG Qiao ,
  • WANG Shuangjing ,
  • JING Liujie ,
  • SHI Yunlong ,
  • WEI Xiaolong ,
  • LI Pengyu ,
  • YANG Chen
Expand
  • (1. China Railway Engineering Equipment Group Co., Ltd., Zhengzhou 450016, Henan, China; 2. School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, China)

Online published: 2024-12-20

Abstract

To explore the disc cutter wear patterns of tunnel boring machine (TBM) in hard rock, a case study is conducted on the Wendeng pumped storage hydropower station. The disc cutter wear data of the case study is collected, based on which, abnormal wear mechanization of center cutter is examined through cutter motion analysis, and a prediction model for cutter wear based on tunneling parameters is established. The results reveal the following: (1) The cutterhead cannot break the rock effectively under the maximum thrust in hard rock tunneling, and abnormal wear of central disc cutter occurs due to disharmony between the cutter radius and the installation radius. (2) The proposed wear prediction model accurately reflects the comprehensive impact of tunneling parameters tunneling length, and installation radius.

Cite this article

JIANG Qiao , WANG Shuangjing , JING Liujie , SHI Yunlong , WEI Xiaolong , LI Pengyu , YANG Chen .

Disc Cutter Wear of Tunnel Boring Machine in Hard Rocks of Pumped Storage Hydropower Station

[J]. Tunnel Construction, 2024 , 44(S2) : 470 -477 . DOI: 10.3973/j.issn.2096-4498.2024.S2.048