Statistical Analysis of Railway Tunnels in China by the End of 2025 and Achievements in the 14th Five-Year Plan Period

  • ZHAO Yong ,
  • TIAN Siming ,
  • GONG Jiangfeng ,
  • CAO Yong
Expand
  • (1. China Railway Economic and Planning Research Institute, Beijing 100038, China; 2. China Railway Shanghai Design Institute Group Corporation Limited, Shanghai 200070, China)

Online published: 2026-04-20

Abstract

According to the statistical analysis conducted on China′s railway tunnels in operation, under construction, and in planning by the end of 2025, China′s operating railway mileage (route-km) reached 165 000 km. A total of 19 438 railway tunnels were in service (~25 242 km), 2 663 under construction (~7 117 km), and 5 426 in planning (~13 560 km). More than 50 400 km of high-speed railway (HSR) was in service in China, with 5 301 operating HSR tunnels, totaling ~9 148 km. Among them, the extra-long railway tunnels included 318 tunnels in service (~4 284 km), 172 tunnels under construction (~2 635 km), and 250 tunnels in planning (~3 532 km). Statistical analysis is conducted on the distribution of under-construction and in-service extra-long railway tunnels across China′s seven geographic regions. A summarization of the major achievements in railway tunnels during the 14th Five-Year Plan period is finally provided.

Cite this article

ZHAO Yong , TIAN Siming , GONG Jiangfeng , CAO Yong . Statistical Analysis of Railway Tunnels in China by the End of 2025 and Achievements in the 14th Five-Year Plan Period[J]. Tunnel Construction, 2026 , 46(4) : 877 -892 . DOI: 10.3973/j.issn.2096-4498.2026.04.019

Outlines

/

〈 〉