ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Treatment Technology of Mud and Water Gushing in F21 Fault of Dananshan Tunnel on XiamenShenzhen Railway
Received date: 2008-04-15
Revised date: 2009-07-07
Online published: 2010-04-20
Mud and water gushing happened during the construction in DK262 +411 section of F21 fault in Dananshan tunnel on XiamenShenzhen Railway with the water gushing volume being 60m3/h. The dominant ground in that section is fault breccia consisting of granite, quartzite and diabase, which is subject to becoming mud when water is encountered and has poor stability. A groutstopping wall is designed according to the site conditions and fullface grouting technology, with the grouting boreholes being drilled from the upper semisection, is applied in the tunnel construction to seal off the water and strengthen the ground, which ensures safe tunnelling through the fault section.
PU Xiaoping, WANG Quansheng . Treatment Technology of Mud and Water Gushing in F21 Fault of Dananshan Tunnel on XiamenShenzhen Railway[J]. Tunnel Construction, 2009 , 29(4) : 466 -469 . DOI: B
/
| 〈 |
|
〉 |