ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Key Technologies of LongDistance Shield Boring in Hard Rock

Expand
  • 1. Southwest Jiaotong University2. China Railway South Investment and Development Co., Ltd.

Received date: 2009-05-18

  Revised date: 2009-06-26

  Online published: 2010-04-20

Abstract

The running tunnel between Buji station and Baigelong station on No.5 line of Shenzhen Metro is located in hard rock and is constructed by shield machine. The authors study the technical difficulties encountered in the longdistance shield boring in hard rock in this paper. The problems of serious cutter wear and segment dislocation are solved by adopting proper cutting tools and selecting reasonable boring modes, boring parameters and reasonable simultaneous grouting parameters, as well as by strengthening cutting tool maintenance.

Cite this article

LI Maowen,LIU Jianguo,HAN Xuefeng,CHEN Shougen . Key Technologies of LongDistance Shield Boring in Hard Rock[J]. Tunnel Construction, 2009 , 29(4) : 470 -474 . DOI: B

Outlines

/

〈 〉