Analysis and Application of Coordinates Back Calculation in Tunnel Survey

Expand
  • The 3rd Engineering Co., Ltd. of China Railway Tunnel Group

Received date: 2009-06-12

  Revised date: 2009-07-16

  Online published: 2010-04-20

Abstract

Based on the analysis of the geometric characteristics of the contour line and plan curve of tunnel crosssections, the author makes further study on the straight line, circular curve and transition curve of the plan curve. Then, the author works out a coordinate back calculation program for those 3 curves by CASIO fx4800 calculator. The mileage and deviation distance are calculated by the mentioned back calculation program. On basis of the calculation program for the overbreak and underbreak, accurate settingout and checking of the tunnel can be performed. This method can also be used for the settingout and checking of other structures of tunnels.

Cite this article

SHI Jixun . Analysis and Application of Coordinates Back Calculation in Tunnel Survey[J]. Tunnel Construction, 2009 , 29(4) : 475 -480 . DOI: B

Outlines

/

〈 〉