ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Study on Improving Efficiency of Advance Geological Forecast of Tunnel

Expand
  • 1. China Railway Tunnel Group Co., Ltd.2. China Railway Tunnel Survey &|Design Institute Co., Ltd

Received date: 2008-04-01

  Revised date: 2009-05-11

  Online published: 2009-09-08

Abstract

 At present, the requirements for safety in tunnel construction are strict. Due to the fact that advance geological forecast takes a long time, geological forecast is always neglected in the event of limited construction period and smooth performance of a project. In order to ensure the safety in tunnel construction, the authors improve the advance geological forecast methods based on practices in construction. After the optimization, the time required by advance geological forecast is minimized and the efficiency of advance geological forecast is raised.

Cite this article

CAO Hongbin, WEI Xiuyan . Study on Improving Efficiency of Advance Geological Forecast of Tunnel[J]. Tunnel Construction, 2009 , 29(3) : 310 -312 . DOI: A

Outlines

/

〈 〉