Discussion on Slurry Circulation Technology of Slurry Shield Machine

  • CENG Chui-Gang
Expand
  • Project Management Department of No. 12 Bid Section of No.2 Line of Shenyang
    Metro under China Railway Tunnel Stock Co., Ltd.,

Received date: 2008-11-07

  Revised date: 2009-01-21

  Online published: 2009-11-17

Abstract

In accordance with the construction experience, the author gives a brief introduction to the selection theory and matching principle of the slurry circulation system of slurry shield machines and studies on the calculation methods of the slurry circulation systems, as well as on some specific issues concerned with the boring of slurry shield machines. This paper can provide reference for similar projects in the future.

Cite this article

CENG Chui-Gang . Discussion on Slurry Circulation Technology of Slurry Shield Machine[J]. Tunnel Construction, 2009 , 29(2) : 162 -165,193 . DOI: B

Outlines

/

〈 〉