Application of ADECORS Approach in Design and
Construction of Tunnels: Case Study on Tartaiguille
Tunnel on TGV Mediterranean Line (From Lyon to Marseilles)
Received date: 2009-01-12
Online published: 2009-11-17
With 2330m length and 180m2 crosssection area, Tartaiguille tunnel runs through fractured soft ground. The tunnel is originally excavated by top heading/bench method and is reinforced with shotcreting, rock bolting, steel ribs and castinsitu concrete lining. During the construction of the tunnel, serious deformation occurs so that the construction of the tunnel has to be suspended. New design and construction solutions must be adopted for the tunnel. After full examination, ADECORS approach is finally adopted for the design and construction of the tunnel and great success has been achieved. Case study is made on the application of ADECORS approach in the design and construction of the tunnel in respects of survey stage, diagnosis stage, therapy stage, operation stage and operation stage.
Zhai Jinying,TANG Jing
. Application of ADECORS Approach in Design and
Construction of Tunnels: Case Study on Tartaiguille
Tunnel on TGV Mediterranean Line (From Lyon to Marseilles)[J]. Tunnel Construction, 2009
, 29(2)
: 208
-215
.