Construction Survey Technology for Taloon Tunnel in Iran
Received date: 2008-10-15
Revised date: 2008-12-29
Online published: 2009-11-17
The complete construction survey process of Taloon Tunnel in Iran is introduced in this paper and the key technology for the tunnel construction survey is described in detail. In order to change the usually adopted backward and complicated methods in tunnel settingout survey in Iran, a crosssection settingout survey programme based on programmable calculator is developed. This programme not only simplifies the crosssection settingout survey process, but also increases some rechecking conditions and reduces the probability of errors in calculation. The new technologies and methods used in tunnel construction survey in foreign countries are also discussed in detail.
Key words: surveytunnelcoordinate
GU Deshan,ZHAO Xingying . Construction Survey Technology for Taloon Tunnel in Iran[J]. Tunnel Construction, 2009 , 29(1) : 105 -108 . DOI: B
/
| 〈 |
|
〉 |