ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Study on CRD Construction Method for Longdistance
Fullyheavily Weathered Ground of Subsea Tunnel
Received date: 2008-01-29
Revised date: 2008-02-15
Online published: 2009-11-18
On the coast land portion of Xiang’an subsea tunnel in Xiamen, China, there exist 800~1000m long fullyweathered soil ground and fullyheavily weathered rock/soil alternative ground. The cover depth of the coast land portion of Xian’an subsea tunnel ranges from 6m to 30m, however, the cover depth of more than 80% of the coast land portion of the tunnel ranges from 6m to 17m. Therefore, the coast land portion of Xiang’an subsea tunnel belongs to shallow/supershallow covered tunnel. The coast land portion of the tunnel is completely located below the ground water table. Furthermore, due to the heavy rainfall in Xiamen area, the ground contains abundant ground water. The soil ground of the tunnel will collapse as soon as water is encountered. The tunnel is constructed by means of CRD method. On basis of the construction of the tunnel, the author expounds on the construction sequences, primary reinforcement parameters, construction step lengths and equipment matching of CRD construction method adopted for the mentioned ground and draws some conclusions related to the construction parameters in similar grounds.
SUN Zhenchuan
. Study on CRD Construction Method for Longdistance
Fullyheavily Weathered Ground of Subsea Tunnel[J]. Tunnel Construction, 2008
, 28(1)
: 15
-18
.
DOI: B
/
| 〈 |
|
〉 |