  • Beijing Railway Underground Rapid Transit Project Department, the
    2nd Engineering Co., Ltd. of China Railway Tunnel Group

Received date: 2007-08-24

  Revised date: 2007-11-01

  Online published: 2009-11-18

Abstract

The construction joint Waterproofing methods of Metro works that are at present in use are described and compared in detail. The advantages and disadvantages of the Waterproofing methods are analyzed in terms of Waterproofing construction and Waterproofing effect. Three construction joint Waterproofing methods, i.e., Waterproofing by means of double expandable caulking glues and grouting pipes, Waterproofing by means of steeledged rubber water stripes and Waterproofing by means of prefabricated expandable rubber water stops, are presented. The material performances, installation methods, Waterproofing principles and application scopes of the mentioned three Waterproofing methods are described in the paper.

Cite this article

MENG Haifeng . Case Study on Construction Joint Waterproofing
Methods of Beijing Metro Works[J]. Tunnel Construction, 2008
, 28(1) : 85 -88 . DOI: B

Outlines

/

〈 〉