Application of TMS in Construction Survey of Tunnel Transition Sections

Expand
  • Project Management Department of Guandi Hydropower Works, Sinohydro No. 1
    Engineering Bureau

Received date: 2007-07-06

  Revised date: 2007-10-17

  Online published: 2009-11-18

Abstract

 In general cases, the settingout survey of the tunnel transition sections needs some interpolation calculations made as per the designed plans, which are always very complex and contain much trivial details. The tunnel measurement system "TMS", however, provides an automatic solution for the issue.

Cite this article

ZHANG Xueqiang . Application of TMS in Construction Survey of Tunnel Transition Sections[J]. Tunnel Construction, 2008 , 28(1) : 93 -96 . DOI: B

Outlines

/

〈 〉