Translation and Reinforcement of Left Tgirder of Existing Wenfan
Bridge on WuKang Doubletrack Railway Project

Expand
  • The 2nd Engineering Co., Ltd. of China Railway Tunnel Group

Received date: 2007-09-03

  Revised date: 2007-10-24

  Online published: 2009-11-18

Abstract

 A translation and reinforcement plan is proposed  for the left Tgirder of the existing Wenfan bridge on basis of the design and actual conditions of the job site. For the sake of construction of existing railway, the safetyguarantee measures, labor protection and equipment matching for the construction are also expounded.