ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Discussion on Quality Control of Lime Improved Soil

Expand
  • 1. Engineering Test Center of China Railway Tunnel Group Co., Ltd.2. Xi’an Highway Survey &|Design Institute

Received date: 2007-04-02

  Revised date: 2007-11-12

  Online published: 2009-11-18

Abstract

 The construction technology and quality control of the lime improved soil are comparatively complicated and there are many factors that influence the quality of the lime improved soil. If effective measures are not taken, the quality of the lime improved soil can not meet the requirements of the relevant standards and defects may occur. In the paper, factors that influence the quality of the lime improved soil are analyzed and prevention countermeasures are recommended for the common defects, which can provide reference for other testing persons.

Cite this article

ZHANG Xun, NIU Tianpei . Discussion on Quality Control of Lime Improved Soil[J]. Tunnel Construction, 2008 , 28(1) : 114 -116 . DOI: B

Outlines

/

〈 〉