Material Transportation Optimization for TunnelConstruction

Expand
  • 1. Development and Research Center of China Geological Survey2. Managing Department, the Armed Police Academy

Received date: 2007-09-14

  Revised date: 2008-01-10

  Online published: 2011-08-17

Abstract

By establishing the construction material delivery planning modeland by solving the model, the optimaldelivery plan can be achieved under the condition without considering the time factor and considering the time factor respectively. In tunnel construction practices, this kind of optimal delivery plan can save a large amount of delivery fees and transportation time and as result can shorten the construction period.

Cite this article

XU Huasheng, ZHENG Guoyong2 . Material Transportation Optimization for TunnelConstruction[J]. Tunnel Construction, 2008 , 28(2) : 151 -153,185 . DOI: A