Application of Monitoring Technology in Construction of Extremelyhigh
Groundstressed Portion of Baozhen Tunnel

Expand
  • YichangWanzhou Railway Project Management Department, No. 1
    Engineering Co., Ltd., No. 5 Bureau Group, C.R.E.C.

Received date: 2007-09-14

  Revised date: 2008-01-14

  Online published: 2011-08-17

Abstract

On basis of the insitu monitoring results and the measured data of ground pressure,  primary reinforcement stress and structure internal force, the pattern of the huge deformation of the soft ground in the extremelyhigh groundstressed portion of Baozhen tunnel is analyzed and the corresponding construction parameters are timely adjusted, which guarantees the construction safety.

Cite this article

ZHANG Qunjian . Application of Monitoring Technology in Construction of Extremelyhigh
Groundstressed Portion of Baozhen Tunnel[J]. Tunnel Construction, 2008
, 28(2) : 213 -216 . DOI: B