ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Construction Technology for Floor Slabs of Nonballast Tracks in
Passengerdedicated Railway Tunnels
Received date: 2007-09-14
Online published: 2011-08-17
As the major loadbearing layer of the understructure of the nonballast track, the floor slab of the nonballast track system has high requirements in construction quality. Due to the narrow working space inside the tunnels, the rapid and highquality construction of the floor slabs inside tunnels becomes one of the most important aspects in the construction of passengerdedicated railway tunnels. The construction of the floor slabs of the nonballast track system inside Dabieshan tunnel is presented in the paper, which can provide reference for the construction of the floor slabs in other passengerdedicated railway tunnels.
WANG Yanmin, XI Zhengbing
. Construction Technology for Floor Slabs of Nonballast Tracks in
Passengerdedicated Railway Tunnels[J]. Tunnel Construction, 2008
, 28(2)
: 228
-231
.
DOI: B
/
| 〈 |
|
〉 |