Application of Large Piperoof Advance Reinforcement Technology in
Karst Treatment Construction of Nanshan Tunnel
Received date: 2008-01-31
Revised date: 2008-05-05
Online published: 2009-11-19
The design and construction of the large piperoof advance reinforcement applied in the treatment of the karsts in Nanshan tunnel are presented in the paper, with the emphasis being placed on the presentation of the construction process, safety control measures and effect assessment of the large piperoof reinforcement. The engineering practice proves that the large piperoof advance reinforcement technology is effective in the treatment of the filling karst caves. The successful engineering experience can provide reference for similar works in the future.
GUO Qun
. Application of Large Piperoof Advance Reinforcement Technology in
Karst Treatment Construction of Nanshan Tunnel[J]. Tunnel Construction, 2008
, 28(3)
: 336
-338
.