ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Theoretical Calculation and Analysis on Works Stability:
Case Study on South Tibet Road Rivercrossing Tunnel
Passing Underneath M8 Metro Running Tunnel in Shanghai

Expand
  • Shanghai Branch of Maunsell Consultant (Shenzhen) Co., Ltd.

Received date: 2008-02-21

  Revised date: 2008-06-02

  Online published: 2009-11-23

Abstract

The influence of the boring of largediameter shield machines on the longitudinal displacement, antifloating performance and lining structure of the existing Metro running tunnel is obtained by means of simulation of the twice passing of the large slurry shield machines underneath the existing Metro running tunnel. Consolidation measures are proposed on basis of the calculation and analysis results to minimize the influence on the existing Metro running tunnel so as to protect the Metro running tunnel from being damaged.

Cite this article

DU Feng . Theoretical Calculation and Analysis on Works Stability:
Case Study on South Tibet Road Rivercrossing Tunnel
Passing Underneath M8 Metro Running Tunnel in Shanghai[J]. Tunnel Construction, 2008
, 28(4) : 403 -407 . DOI: A

Outlines

/

〈 〉