ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Problems and Countermeasures for Concrete Construction of Pile
Foundations of Passengerdedicated Railway Works
Received date: 2008-01-10
Revised date: 2008-05-16
Online published: 2009-11-23
The concrete for the pile foundations of passengerdedicated railway works has such special requirements as high flowability, high water retentivity and long designed service life. In the paper, the author analyses the influence on the performance of the concrete imposed by the concrete mixture volumes, the highefficiency polycarboxylate additives and the active mineral admixtures (such as fly ash) respectively by means of simulating the actual construction conditions and experiments. On basis of the practical experience in the mixing ratio design and process control of high performance concrete, the author proposes some countermeasures (including dynamic control of the quality of the raw materials, selecting proper concrete mixture volumes and controlling the buried depth of the tremie during concrete casting) for the common problems (such as overthick laitance) occurring during the concrete construction of pile foundations of passengerdedicated railway works.
LI Gangqiang
. Problems and Countermeasures for Concrete Construction of Pile
Foundations of Passengerdedicated Railway Works[J]. Tunnel Construction, 2008
, 28(4)
: 479
-482,493
.
DOI: B
/
| 〈 |
|
〉 |