ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Key Technology for Construction of Secondary Lining of Mined Metro Ventilation
Gallery with Double Story, Double Span, Flat Roof and Upright Wall
Received date: 2008-01-07
Revised date: 2008-05-22
Online published: 2009-11-23
The construction of mined Metro ventilation gallery with large crosssection, double storey, double span, flat roof and upright wall has such features as relatively large excavation span, complex temporary support system and complex loadshifting of the secondary lining structure. Taking the construction of the doublestorey section of No. 1 ventilation gallery of Shiliuzhuang Road Station on Line 4 of Beijing Metro as example, the authors summarize the key construction technology for the ventilation gallery with large crosssection, double storey, double span, flat roof and upright wall in terms of central drift excavation method, load shifting and sectionbysection construction of the insitu cast concrete lining. The project practice shows that the construction plan is reasonable and feasible.
YANG Weihu ,DU Jiang , LIU Huanqiang
. Key Technology for Construction of Secondary Lining of Mined Metro Ventilation
Gallery with Double Story, Double Span, Flat Roof and Upright Wall[J]. Tunnel Construction, 2008
, 28(4)
: 465
-468,488
.
DOI: B
/
| 〈 |
|
〉 |