Key Technology for Construction of Secondary Lining of Mined Metro Ventilation
Gallery with Double Story, Double Span, Flat Roof and Upright Wall

Expand
  • 1. Xi’an Railway Engineering Co., Ltd, Electrification Bureau Group, CREC2. Beijing
    Jiaotong University3. Shijiazhuang Railway Institute

Received date: 2008-01-07

  Revised date: 2008-05-22

  Online published: 2009-11-23

Abstract

The construction of mined Metro ventilation gallery with large crosssection, double storey, double span, flat roof and upright wall has such features as relatively large excavation span, complex temporary support system and complex loadshifting of the secondary lining structure. Taking the construction of the doublestorey section of No. 1 ventilation gallery of Shiliuzhuang Road Station on Line 4 of Beijing Metro as example, the authors summarize the key construction technology for the ventilation gallery with large crosssection, double storey, double span, flat roof and upright wall in terms of central drift excavation method, load shifting and sectionbysection construction of the insitu cast concrete lining. The project practice shows that the construction plan is reasonable and feasible.

Cite this article

YANG Weihu ,DU Jiang , LIU Huanqiang . Key Technology for Construction of Secondary Lining of Mined Metro Ventilation
Gallery with Double Story, Double Span, Flat Roof and Upright Wall[J]. Tunnel Construction, 2008
, 28(4) : 465 -468,488 . DOI: B

Outlines

/

〈 〉