Discussion on Rational and Rapid Mucking Transport Method
Received date: 2008-06-06
Revised date: 2008-08-08
Online published: 2009-11-25
The main methods of mucking in tunnel construction with drill and blast method is trackbound transportation system and trackless transportation. This paper mainly analyses the advantages and disadvantages of these two methods, the key factor of controlling mucking efficiency and machine matching principle of these two methods. Based on that, rational and rapid mucking transport method is discussed.
WEI Yanqing . Discussion on Rational and Rapid Mucking Transport Method[J]. Tunnel Construction, 2008 , 28(5) : 561 -565 . DOI: A
/
| 〈 |
|
〉 |