Abstract

According to the field condition of Mazhou Island Project in Shenzhen, the paper mainly introduces the conditions of launching of shield machine in subsea mined tunnel, the main construction technologies and attention items. Furthermore, the key construction technologies, such as construction of tunnel portal, installation of reaction frame, launching cradle construction, assembling of shield machine, slurry preparation and segment installation in the launching of shield machine was presented in detail.

Cite this article

ZHOU Dengwu . Construction Technology for Launching of Whole
Shield Machine in Mazhou Island Project[J]. Tunnel Construction, 2008
, 28(5) : 597 -600,604 . DOI: B