Construction Technology for Metro Stations: Conversion from
Opencut Method to Mining Method
Received date: 2008-05-29
Revised date: 2008-10-17
Online published: 2009-12-02
Due to the ground surface buildings, mining method has to be adopted for some section of a Metro station on Line 5 of Guangzhou Metro, for which opencut method was designed. In the paper, the construction sequence and the major construction technical measures adopted so as to ensure the safety of the buildings are presented, the differences between the changed mining method and the conventional opencut method are compared and the advantages/disadvantages of the changed mining method are summarized so as to select construction methods and construction measures more reasonably. The paper can provide reference for similar works in the future.
ZHANG Shuai-Jun
,
QIU Gao-Wen
. Construction Technology for Metro Stations: Conversion from
Opencut Method to Mining Method[J]. Tunnel Construction, 2008
, 28(6)
: 724
-727
.
DOI: B
/
| 〈 |
|
〉 |