Abstract

Blast is the leading sequence of tunnel excavation and progress and cost are a pair of interactive factors of tunneling. In this article, the achievable pullout length under restricted charge weight per delay is verified and the reasonable drill hole numbers and explosives to be charged for a certain pullout Length are also discussed. This article is aimed at drawing the attention of the technical persons in the field of tunneling to the importance of study on pullout length and powder factor.

Cite this article

XIONG Chao-Dong . Discussions on Pullout Length and Powder Factor of Drill+blast Tunnel[J]. Tunnel Construction, 2007 , 27(1) : 62 -64 . DOI: B