ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Analysis on Construction Scheme of Nama Tunnel

  • HU Jing-Feng
Expand
  • China Railway 7th Engineering Bureau Group Co., Ltd.

Received date: 2006-10-10

  Revised date: 2006-12-13

  Online published: 2009-12-02

Abstract

Nama tunnel, which is an integral part of QianGui railway updating project, is designed to be 2788m long. Crossing several fault zones, the tunnel has poor geological conditions. The exit portion of the tunnel is located on slide slopes, which has extremely complex geological conditions. Due to the tight construction schedule of the tunnel, it is determined to install an inclined shaft so as to provide more working faces. Such reinforcement measures as pipe roof, forepoling, grouting and steel arches are taken so that the tunnel can cross the fractured zones successfully. In the paper, the construction scheme of the tunnel and the countermeasures taken to cope with the poor geological conditions are presented.

Cite this article

HU Jing-Feng . Analysis on Construction Scheme of Nama Tunnel[J]. Tunnel Construction, 2007 , 27(1) : 65 -69 . DOI: B

Outlines

/

〈 〉