ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Selection of Construction Program for Zhou’aodi
Underground Passage Project

  • LIAO Jun ,
  • XIE Yong ,
  • Gao-Xiang
Expand
  • 1. Wenzhou Communications Planning &|Design Institute2. Wenzhou Urbanbypass Highway Construction Headquarters3. Zhejiang Provincial Communications Planning &|Design Institute.

Received date: 2007-01-23

  Revised date: 2007-02-05

  Online published: 2009-12-03

Abstract

In the paper, the construction program of Zhou'aodi underground passage is presented, with the emphasis being placed on the analysis and comparison of the separate bridge option and the shallowburied undercut tunnel option. The technical difficulties, construction periods, impacts on the construction of Wenzhou urbanbypass highway, construction costs and impacts on the safe operation of Jinliwen highway of the two options are considered comprehensively and it is recommended that the shallowburied undercut tunnel option should be adopted.

Cite this article

LIAO Jun , XIE Yong , Gao-Xiang . Selection of Construction Program for Zhou’aodi
Underground Passage Project[J]. Tunnel Construction, 2007
, 27(2) : 50 -53 . DOI: B

Outlines

/

〈 〉