ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Design of Final Joint of Shengwudao~Daxuecheng Immersed Tunnel
Received date: 2007-04-03
Online published: 2009-12-04
The positions and types of the final joints have great influence on the construction period and construction cost of immersed tunnels. Taking the design of the final joint of Shengwudao~Daxuecheng immersed tunnel as case history, the author presents the final design scheme and the technical construction measures for the immersed tunnel in the paper, which can provide reference for the design of similar works in the future.
LIU Jian-Fei . Design of Final Joint of Shengwudao~Daxuecheng Immersed Tunnel[J]. Tunnel Construction, 2007 , 27(3) : 43 -46 . DOI: B
/
| 〈 |
|
〉 |