ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Design of Solutions for Shielddriven Running Tunnel Crossing Bridge Piles:
Case Study on a Shielddriven Running Tunnel on Line 1
of Suzhou Mass Rapid Transit (MRT) System
Received date: 2006-11-13
Revised date: 2007-01-22
Online published: 2009-12-04
In the paper, the design of the solutions for Xinghaijie station~Xinggangjie station shielddriven running tunnel crossing the piles of Hua bridge are presented, expatiations are made on the possible bridge pile treatment solutions in terms of technical feasibility, economical rationality and impacts on the surrounding environment and a solution most suitable for the project is selected. It is hoped that the design concept and design method can provide reference for similar works in the future.
LIU Yong
,
HE Zhen-Hua
,
LI Zhong
. Design of Solutions for Shielddriven Running Tunnel Crossing Bridge Piles:
Case Study on a Shielddriven Running Tunnel on Line 1
of Suzhou Mass Rapid Transit (MRT) System[J]. Tunnel Construction, 2007
, 27(3)
: 51
-55
.
DOI: B
/
| 〈 |
|
〉 |