ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Major ConstructionDifficulties of and Solutions for Construction of
Fenghuoshan Tunnel on Qinghai~Tibet Railway

  • HU Jing-Feng
Expand
  • China Railway 7th Engineering Group Co., Ltd.

Received date: 2007-03-27

  Revised date: 2007-05-08

  Online published: 2009-12-04

Abstract

Fenghuoshan tunnel on Qinghai~Tibet railway, with an altitude of 4900 meters, is at present the highest railway tunnel in the world. The natural conditions, such as the extremely coldness and oxygen deficiency, impose great difficulty for the construction of Fenghuoshan tunnel. On basis of presenting the construction methods of Fenghuoshan tunnel, the author summarizes the specific solutions for the excavation, lining, concrete construction, waterproofing and drainage, ventilation and exhaust air control and freezing prevention and thermal keeping of tunnels under extremely cold and oxygendeficient conditions, which can provide reference for similar works in the future.

Cite this article

HU Jing-Feng . Major ConstructionDifficulties of and Solutions for Construction of
Fenghuoshan Tunnel on Qinghai~Tibet Railway[J]. Tunnel Construction, 2007
, 27(3) : 56 -58,104 . DOI: B

Outlines

/

〈 〉