ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Construction Technology for Tunnel Sections Passing through Superhuge
Karst Collapse Accumulation Body: Case Study on Yesanguan Tunnel

  • ZHANG Shun-Zhong
Expand
  • The 2nd Engineering Co., Ltd. of China Railway Wuju Group

Received date: 2007-03-28

  Online published: 2009-12-04

Abstract

A section of Yesanguan tunnel on Shanghai~Chengdu highway passes through a superhuge karst collapse accumulation body. The construction technologies for the mentioned section of Yesanguan tunnel, including advance reinforcement, tunnel excavation and floor consolidation, are presented in the paper. Such countermeasures as long forepoling reinforcement assisted with pregrouting, top heading/bench excavation method, Ishaped steel ribs and floor grouting consolidation are taken during tunnel construction and good results have been achieved.

Cite this article

ZHANG Shun-Zhong . Construction Technology for Tunnel Sections Passing through Superhuge
Karst Collapse Accumulation Body: Case Study on Yesanguan Tunnel[J]. Tunnel Construction, 2007
, 27(3) : 59 -61 . DOI: B

Outlines

/

〈 〉