ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Treatment Technology for Portal Section of Twintube Soft Ground
Tunnel with Largespan and Smallspacing

  • HUANG Xin-She ,
  • CAO Zheng-Chi
Expand
  • 1. Hangzhou Branch of China Railway Tunnel Group Co., Ltd2. Scientific Research Institute of China Railway Tunnel Group Co., Ltd.

Received date: 2007-05-10

  Online published: 2009-12-04

Abstract

Shenyingxian tunnel, which is located in Shenjiamen urban area in Zhoushan city, is 1230m long. The north and south portal sections of Shenyingxian tunnel are located in fullyweathered to heavilyweathered cohesive soil ground containing gravels. The treatment of the portal sections of Shenyingxian tunnel, including small duct reinforcement, umbrella arch reinforcement and grouting reinforcement, is presented in the paper.

Cite this article

HUANG Xin-She , CAO Zheng-Chi . Treatment Technology for Portal Section of Twintube Soft Ground
Tunnel with Largespan and Smallspacing[J]. Tunnel Construction, 2007
, 27(3) : 79 -83 . DOI: B

Outlines

/

〈 〉