ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Construction Achievements of QinghaiTibet Railway

  • WANG Meng-Shu ,
  • He-Hua-Wu
Expand
  • 1. China Railway Tunnel Group Co., Ltd.2. Ministry of Railways of the People's Republic of China

Received date: 2007-09-01

  Online published: 2009-12-05

Abstract

Great achievements have been made in the construction of QinghaiTibet railway: a. Breakthrough development has been achieved in the construction of QinghaiTibet railway; b. The difficult problem of frozen soil has been solved by means of scientific and technological innovations; c. The basic national policy of protecting the ecological environment has been strictly followed; d. Medical and health measures have been taken in advance and the health of the workers has been guaranteed; e. The railway construction concept has been updated and world firstclass railway has been built.

Cite this article

WANG Meng-Shu , He-Hua-Wu . Construction Achievements of QinghaiTibet Railway[J]. Tunnel Construction, 2007 , 27(5) : 1 -4 . DOI: B

Outlines

/

〈 〉