Matching between Thrust Speed of Main Shield
Machine and Capacity of Slurry System

  • ZHANG Ning-Chuan
Expand
  • China Railway Tunnel Stock Co., Ltd

Received date: 2007-10-26

  Online published: 2009-12-06

Abstract

The matching between the thrust speed of the main shield machine and the capacity of the slurry system is elaborated in the paper by analyzing the relationship between the slurry flow rates and the shield advance rates so as to provide some reference for shield users.

Cite this article

ZHANG Ning-Chuan . Matching between Thrust Speed of Main Shield
Machine and Capacity of Slurry System[J]. Tunnel Construction, 2007
, 27(6) : 7 -9 . DOI: B