ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Construction Technology for EPB Shield Crossing Xinzaohai
under Complex Geological Conditions

  • WANG Meng-Qing ,
  • XU Jun-Zhe ,
  • Ni-Bing-Yu
Expand
  • 1. China Railway Tunnel Stock Co.| Ltd.2. China Railway Tunnel Survey &|Design Institute Co., Ltd.

Received date: 2007-11-06

  Revised date: 2007-11-15

  Online published: 2009-12-06

Abstract

With the development of urban rail transit, shield tunneling method has achieved rapid development in Metro construction. With reference to the practice of engineering project, the author mainly elaborates the critical technology for EPB shield tunneling crossing Xinzaohai (510m) in Xiaoxin section of line 4 of Guangzhou Metro. The successful execution of this project could give reference for similar works crossing seas in the future.

Cite this article

WANG Meng-Qing , XU Jun-Zhe , Ni-Bing-Yu . Construction Technology for EPB Shield Crossing Xinzaohai
under Complex Geological Conditions[J]. Tunnel Construction, 2007
, 27(6) : 52 -56,62 . DOI: B

Outlines

/

〈 〉