ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Practice of Risk Identification and Assessment of
Shield Tunnelling in Chengdu Metro

  • XU Run-Ze ,
  • SONG Tian-Tian
Expand
  • 1. The 2nd branch of China Railway of 13th Bureau Group2. Department of Urban Rail Transit and Railway Engineering

Received date: 2007-11-19

  Online published: 2009-12-06

Abstract

It is the first time that Earth Pressure Balanced is used to construct Metro tunnel in Chengdu. The ground is full of water and contains a large amount of cobbles. Therefore the shield tunneling is very difficult. In the paper, the risk mechanisms of this project is studied, the main risks are found out, assessed and classified employing the method of R=P×C and the risk classification is determined. These studies ensure the successful progress of the project.

Cite this article

XU Run-Ze , SONG Tian-Tian . Practice of Risk Identification and Assessment of
Shield Tunnelling in Chengdu Metro[J]. Tunnel Construction, 2007
, 27(6) : 98 -100,104 . DOI: A

Outlines

/

〈 〉