Abstract

The shield tunneling quotas used in the cost budgeting for the Metro works in different cities in China are presented and brief analysis is made on some quotas. The paper can provide reference for the cost budgeting of shield tunneling works and for the revising of the quotas of shieldbored Metro tunnel works in the future.

Cite this article

JIANG Hong-Jun . Cost Budgeting and Quota Analysis for Shield Tunneling
Works in Different Cities in China[J]. Tunnel Construction, 2007
, 27(6) : 105 -107,111 . DOI: C