Feasibility Study on Application of Open Shield in Construction of Beijing
Metro Tunnels in Cobblecontained Ground

  • GUO Jing-Bo ,
  • Wang-Yan-Fang
Expand
  • 1.School of Mechanical Engineering and Automation, Shijiazhuang Railway Institute, Shijiazhuang 050043, China|
    2.Beijing Huasuitong Tunneling Equipment Co., Ltd., Beijing 100081, China

Received date: 2009-09-07

  Online published: 2009-12-08

Abstract

 Focusing on the challenge of boring in cobblecontained ground, the authors make feasibility study on application of open shield in construction of Beijing Metro tunnels in cobblecontained ground in terms of geological adaptability, structural maintainability, performance, advantages in coping with large cobbles and boulders, construction safety and quality and boring speed. The authors propose the design and boring techniques of open shield for Beijing Metro works. Regarding boring in cobblecontained ground, the authors make comparison and contrast between EPB shield and open shield in terms of boring speed, economical index and comprehensive performance. The authors conclude that it is worth to take open shield into consideration in the selection of proper shields for cobblecontained ground.

Cite this article

GUO Jing-Bo , Wang-Yan-Fang . Feasibility Study on Application of Open Shield in Construction of Beijing
Metro Tunnels in Cobblecontained Ground[J]. Tunnel Construction, 2009
, 29(5) : 481 -484 . DOI: A

References

许占良. 开敞式TBM在管涔山隧道施工的适应性研究\[J\].铁道工程学报,2007(8): 53-57.
张亚丰,朱玉峰.开敞式TBM的拆卸流程\[J\].黑龙江水利科技,2009(2): 51-52.
王梦恕.开敞式TBM在铁路长隧道特硬岩、软若地层的施工技术\[J\].土木工程学报,2005(5): 54-58.
赵毅.开敞式TBM穿越不良地质段施工技术\[J\].科技情报开发与经济,2008(12): 214-217.
刘春,殷耀章.关于TMB设备选型的研究\[J\].建筑机械,2002(11): 40-43.
卢智强. 秦岭隧道开敞式TBM施工的初期支护\[J\].现代隧道技术,2000(2): 51-54.