ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Analysis on and Control of Settlement in Metro Construction

  • JIA Jian-Jun ,
  • Zhang-Ding-Li ,
  • Wang-Meng-Shu ,
  • Zhang-Cheng-Beng
Expand
  • 1. Tunnels and Underground Works Research &|Test Center of Beijing Jiaotong University2. China Railway Tunnel Group Co., Ltd

Received date: 2005-08-26

  Revised date: 2006-01-13

  Online published: 2010-01-26

Abstract

On basis of the results of the monitoring and measurement of Huangzhuang station of line No. 4 and No. 10 of Beijing Metro, the article summarizes the reasons and regular pattern of ground surface settlement and crown subsidence of Huangzhuang station of line No. 4 of Beijing Metro constructed by shallowburied undercutting method, and presents relevant countermeasures to control the settlement. The article can provide guidance for the construction of similar works in the future.

Cite this article

JIA Jian-Jun , Zhang-Ding-Li , Wang-Meng-Shu , Zhang-Cheng-Beng . Analysis on and Control of Settlement in Metro Construction[J]. Tunnel Construction, 2006 , 26(1) : 10 -13 . DOI: A

Outlines

/

〈 〉