ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Analysis on Application of Isolation Piles in Construction
of Mined Tunnels Underneath Existing Buildings

  • GU Chi-Chao
Expand
  • Beijing Branch of China Railway Tunnel Group Co.|Ltd.

Received date: 2005-06-07

  Online published: 2010-01-26

Abstract

Due to the short distance between the mined exit/entrance tunnel and the existing buildings, isolation piles are installed during the tunnel construction so as to ensure the safety of the existing buildings. By means of numerical simulations, analysis and calculations, the article makes a comparison of the settlement value after construction and that during each construction stage under two different working conditions, i.e., condition with isolation piles being installed between the tunnel and the existing buildings and condition with isolation piles being not installed, and draws a conclusion that installing isolation piles is a feasible solution.

Cite this article

GU Chi-Chao . Analysis on Application of Isolation Piles in Construction
of Mined Tunnels Underneath Existing Buildings[J]. Tunnel Construction, 2006
, 26(1) : 25 -26,101 . DOI: A

Outlines

/

〈 〉