ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Construction and Distortion Analysis of Piperoof Installed in
Chongwenmen Metro Station Underneath Existing Metro Line
Received date: 2005-07-07
Online published: 2010-01-26
Chongwenmen Metro station of No.5 line of Beijing Metro crosses underneath the existing Metro line, with the distance between the vault of Chongwenmen Metro station and the soleplate of the existing Metro line being only 1.98m. Piperoofs consisting of huge steel pipes are installed as advance reinforcement. The paper introduces the major technologic measures of the construction of the piperoofs and the ground settlement control methods, analyses the distortion mechanisms of the piperoofs and compares the measured distortion values with the calculated values.
CHEN Gao
,
JIANG Jing-Shan
,
TAO Hai-Bei
. Construction and Distortion Analysis of Piperoof Installed in
Chongwenmen Metro Station Underneath Existing Metro Line[J]. Tunnel Construction, 2006
, 26(1)
: 78
-80
.
DOI: A
/
| 〈 |
|
〉 |