ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Countermeasures for Tunnel/shaft Construction in Water
bearing Sand Layers: Case Study on Beijing Metro
Received date: 2006-04-17
Online published: 2009-12-09
On basis of the construction of Ciqikou~Chongwenmen running tunnel and Chongwenmen station of Beijing Metro, the article presents the schemes of the constructions in waterbearing sand layers for the intermediate temporary shaft and cross tunnel of the running tunnel and the southeast ventilation shaft and ventilation tunnel of Chongwenmen station. The article also presents the countermeasures for the prevention of water/sand inflow so as to avoid serious subsidence. The article emphasizes on the different dewatering measures taken according to different geological conditions.
ZHANG Guo-Liang
,
Wang-Jian-Cheng
. Countermeasures for Tunnel/shaft Construction in Water
bearing Sand Layers: Case Study on Beijing Metro[J]. Tunnel Construction, 2006
, 26(3)
: 44
-47
.
DOI: B
/
| 〈 |
|
〉 |