Development Features and Treatment of Karsts along
No. 1 Gaoping Tunnel on YiWan Railway

  • LI Ming-Chong ,
  • Zhang-Min-Qiang ,
  • LI Dai-Ren
Expand
  • 1.China Railway the 4th Survey &|Design Institute2.Scientific Research Institute of China Railway Tunnel Group Co., Ltd.3. YiWan Railway Construction Headquarters

Received date: 2006-05-11

  Online published: 2009-12-09

Abstract

No. 1 Gaoping tunnel on YiWan railway passes through T21j limestone. The tunnel is located in verticalcirculating karst zones, with the maximum overburden being 104m. The karsts along the tunnel are extremely developed, with a total of 51 karst caves having been discovered during the construction of the tunnel. By means of analysis on the karst caves discovered during the tunnel construction, the article makes a study on the features of the development of the karsts located in verticalcirculating zones. On basis of the features of the development of the karsts and the characteristics of the engineering structures, the article suggests a karst scale determination standard, recommends some karst treatment measrues and makes an assessment on the effect of the karst treatment.

Cite this article

LI Ming-Chong , Zhang-Min-Qiang , LI Dai-Ren . Development Features and Treatment of Karsts along
No. 1 Gaoping Tunnel on YiWan Railway[J]. Tunnel Construction, 2006