ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Impact of Overbreak/shortbreak on Tunnel Construction
Cost and Their Control Approaches
Received date: 2006-01-25
Online published: 2010-04-21
The article expatiates on the causes for the overbreak/shortbreak in the drill+blast tunneling and analyzes on the impact of the overbreak/shortbreak on the increase of the tunnel construction cost. Finally, the article recommends three main approaches for the control of the overbreak/shortbreak during tunneling, i.e., ① strengthening the site construction management, which is the fundamental approach to reduce the overbreak/shortbreak; ② fulfilling NATM technology, which is the effective technical approach to reduce the overbreak/shortbreak; ③ replacing the traditional viewpoint of “overbreak rather than shortbreak” by the viewpoint of “less overbreak and less shortbreak”.
WANG Cheng-Shan
. Impact of Overbreak/shortbreak on Tunnel Construction
Cost and Their Control Approaches[J]. Tunnel Construction, 2006
, 26(4)
: 13
-15
.
DOI: B
/
| 〈 |
|
〉 |