Analysis on Insitu Measurement of Biased Pressure
Section of Doublearched Fuxi Tunnel

  • TUN Jiang ,
  • LIU Bao-Guo
Expand
  • Civil Engineering &|Architecture School of Beijing Jiaotong University

Received date: 2005-11-21

  Revised date: 2006-01-11

  Online published: 2010-04-21

Abstract

The article presents in detail the monitoring results of the biasedpressure entrance section of the doublearched Fuxi tunnel on Tong~Huang highway and presents the analysis on the monitoring results. Furthermore, on basis of the construction practice of the tunnel, thearticle analyses on the features of the perimeter displacement of the surrounding rock mass, the crown settlement, the loading conditions of the reinforcement structure and theground surface settlement of the tunnel and recommends some engineering countermeasures, which provides timely and effective guidance for the reinforcement and consolidation of the tunnel, thus guaranteeing the tunnel construction safety.

Cite this article

TUN Jiang , LIU Bao-Guo . Analysis on Insitu Measurement of Biased Pressure
Section of Doublearched Fuxi Tunnel[J]. Tunnel Construction, 2006
, 26(4) : 16 -19,48 . DOI: B