ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Construction Technology for Portal Section of
Shallowburied Tunnel in Soft Ground

  • YANG Chang-Jing
Expand
  • Nanjing Engineering Company of China Railway 18th Bureau Group

Received date: 2005-12-01

  Revised date: 2006-03-01

  Online published: 2010-04-21

Abstract

The geological conditions of the entrance portal section of Laoyeling tunnel on Changchun~Huichun highway is extremely complex, where there exist fault zones and Quaternary clinosol that contains loesses, crushed stones, thick cumulose soil and rich water. Furthermore, the side slopes of the entrance portal section of the tunnel are high and the selfsupport ability of the ground of the side slopes and front slope of the tunnel is very poor. Therefore, it is of great importance to commence the tunnel excavation as soon as possible. The article presents in detail the measures taken so as to commence the excavation of the shallowburied entrance portal section of the tunnel in soft ground.

Cite this article

YANG Chang-Jing . Construction Technology for Portal Section of
Shallowburied Tunnel in Soft Ground[J]. Tunnel Construction, 2006
, 26(4) : 81 -83 . DOI: B

Outlines

/

〈 〉