Application of Monitoring and Measurement in Lined Largespan
Portion of Exit Section of Gaoyangzai Tunnel
Received date: 2005-07-07
Online published: 2010-04-21
The exit portion of Gaoyangzai tunnel on Yiwan railway is located in fractured accumulative ground. It is of great difficulty to build largespanned doubletrack railway tunnels under such difficult geological conditions. Monitoring and measurement provide basis and safety guarantees for the rapid construction of the tunnel. The article presents the execution plan of the monitoring and measurement, analyses the monitoring results and expatiates on the feasibility of building largespanned doubletrack tunnel in fractured accumulative ground.
WANG Guang-Hui
,
FANG Dun-Bei
. Application of Monitoring and Measurement in Lined Largespan
Portion of Exit Section of Gaoyangzai Tunnel[J]. Tunnel Construction, 2006
, 26(4)
: 78
-80
.
DOI: B
/
| 〈 |
|
〉 |