Cause Analysis on and Repairing of Lining Cracks of a Railway Tunnel

  • WANG Meng-Yang
Expand
  • The 2nd Engineering Co., Ltd. of China Railway Tunnel Group

Received date: 2006-02-20

  Revised date: 2006-03-28

  Online published: 2010-04-21

Abstract

The paper gives a detailed analysis on the causes for the cracks of the concrete linings of a railway tunnel located in Northwest of China and presents the critical aspects and results of the repairing of the cracks by means of automatic lowpressure grouting of modified epoxy resin, which provides a new construction method for the repairing of the cracks of the tunnel linings in the future.

Cite this article

WANG Meng-Yang . Cause Analysis on and Repairing of Lining Cracks of a Railway Tunnel[J]. Tunnel Construction, 2006 , 26(4) : 52 -53,83 . DOI: B